BRAUN Windturbinen GmbH

At BRAUN, the wind does not stand still

Wind power in Witten for everyone, upgrade of the ANTARIS 6.0 kW to 6.5 kW, Kuwait “calls”, delegation with district administrator and mayor directly on site and other news You can read all the news in the attached PDF file. Newsletter July 2012