Wind power in Witten for everyone, upgrade of the ANTARIS 6.0 kW to 6.5 kW, Kuwait “calls”, delegation with district administrator and mayor directly on site and other news
You can read all the news in the attached PDF file.
Wind power in Witten for everyone, upgrade of the ANTARIS 6.0 kW to 6.5 kW, Kuwait “calls”, delegation with district administrator and mayor directly on site and other news
You can read all the news in the attached PDF file.

In April 2025, the first Antaris 12 kW was already erected in the Free State of