ANTARIS 6.5 kW small wind turbine in Bavaria in the district of Miesbach
As in previous years, most ANTARIS systems will be built in Bavaria in 2014.This is the 7th plant this year, in total there will probably be 15 in 2014.Bavaria is thus ahead nationwide.The turbine operates on a 24 m lattice mast in 3-phase parallel to the grid, with a Smart!wind inverter 7.5 kW.The repeller diameter […]
Mounting setup ANTARIS 4.5 kW grid-parallel
Assembly setup of the ANTARIS 4.5 kW parallel to the grid on a 14 m high tipping mast in postcode area 19…. .The turbine works in 3-phase parallel to the grid with a Smart!wind 5.5 kW.Despite problems during the approval phase, the project was successfully completed.The good cooperation between the client, the architect and BRAUN […]
ANTARIS 6.5 kW in 3-phase grid-parallel operation.
The ANTARIS 6.5 kW in 3-phase grid-parallel operation.The turbine has a hub height of 24 m and works with the Smart!wind 7.5 kW.The location is in the zip code area 59…The foundation construction is remarkable here, as it was integrated into a raised sound insulation insulation.This is the 3rd plant in the region within a […]
Wind farm in Portugal
The first wind farm with 40 ANTARIS wind turbines in grid-parallel operation is currently being built in Portugal! The turbines each have an output of 3.6 kW, and completion is scheduled for the end of 2008.