December 2009
All ANTARIS 5.5 kW turbines produced up to 68 kWh of clean wind power per day at exposed locations in Portugal in December. In Portugal, one of the 3.5 kW turbines has achieved an annual yield of 4,600 kWh, while the solar power plant with the same output has a yield of 3,900 kWh. You […]
Current performance data + trade fair “new energy husum 2011”
ANTARIS 5.5 kW with only 3.5 m repeller produced in Cork IE 8.000 kWh in 16 months; Hub height 12 m ANTARIS 2.5 kW with 3.0 m Repeller produces 5000 kWh in Schleswig Holstein in 18 months; Hub height 12 m ANTARIS wind turbines at the “new energy husum 2011” trade fair” Our local sales […]
Construction of the ANTARIS 5.5 kW wind turbine in the Westerwald
Construction of the ANTARIS wind turbine at MERTENS and SCHNEIDER – our partner for control system construction, competent and reliable!Exemplary sequence of a construction of a small wind turbine in autumn 2010 in the Westerwald.