OFFROAD road wind installation, A40 near Dortmund
With the kind support of BRAUN Windturbinen GmbH
Links:
http://www.monopol-magazin.de/artikel/20108589/Performance-Electrics-Pablo-Wendel-Interview.html
www.performance-electrics.com
OFFROAD road wind installation, A40 near Dortmund
With the kind support of BRAUN Windturbinen GmbH
Links:
http://www.monopol-magazin.de/artikel/20108589/Performance-Electrics-Pablo-Wendel-Interview.html
www.performance-electrics.com
Our Antaris 12 kW is enthroned on a 24 m high mast and transforms every gust
Today we celebrate a very special anniversary: The journey of Braun Windturbinen GmbH began 30 years
Installed on an impressive 12m high tilting mast, our Antaris works reliably in 3-phase parallel to