ANTARIS 6.5 kW installed near Lübeck
The system works on a 21 m tubular mast, 3-phase parallel to the grid with a Smartwind SW7.5. If you have any questions about the project, give us a call! Joy in the wind, with ANTARIS small wind turbines!
ANTARIS small windturbines working world wide in remote areas

At this site 5 pcs. ANTARIS 9.5 kW are working in remote areas in an hybrid systems with PV and diesel engines as backup.Each Turbine is working with 1 pcs. 10.0 kW, 3-phased Smartwind Inverter, with 2 dumploads (12.0 kW).The complete system is working with Victron Energy Inverter as off-grid manager.4 further projects with 5 […]
ANTARIS Power close to the wind
Here is a screenshot of the ANTARIS 9.5 kW with a current generator power of 13,169 W. The special feature here and cleverly solved by the way:Under appropriate wind conditions, our customer permanently drives 2,500 W to his house network, 6,000 W to heating element 1 and 6,000 W to heating element 2. The advantage:The […]
The ANTARIS 9.5 kW installed in Brunsbüttel, Schleswig-Holstein
The largest turbine in the ANTARIS series was connected to the grid on schedule on 10.09.2015.The plant operates on an 18 m high tubular mast in 3-phase parallel operation to the grid.The expected annual yield at this location is approx. 20,000 kWh.Of course, the system is monitored online and also serves the further development of […]
The ANTARIS 6.5 kW at the NORLA trade fair in Rendsburg
This year, ANTARIS will once again be represented at the North German trade fair. http://www.norla-messe.de/ Our local sales partner, Smart Power Electronics GmbH & Co. KG, will be happy to advise you and, above all, competently and honestly on the subject of ANTARIS small wind turbines, as well as the 3-phase Smart!wind feed-in inverter. http://www.smart-power-electronics.de/cms/de/ […]
The ANTARIS 6.5 kW on the road in northern Hesse
The system works on a 24 m tubular mast, 3-phase parallel to the grid with a Smartwind SW7.5.Respect and recognition for the creative design of the wind vane, as well as the professional handling of the BV.A big thank you also to our “old” customers who were always there with good advice.Notable here:The relatively large […]
Yield overview ANTARIS 6.5 kW

The ANTARIS 6.5 kW on a 24 m mast in Schleswig-Holstein.The turbine works in 3-phase with a Smartwind 10.0 kW.The yield data is in a class of its own, see for yourself.The upper blue row documents the monthly yields in 2015 with just under 900 kWh/month.And that in the rather windless season!The average annual yields […]
New installations in the north of Russia

Here we have 2 off-grid sites working with ANTARIS Wind Turbines in remote areas as hybrid systems with PV and diesel engines as backup.One site is working with 4 pcs. ANTARIS 4.5 kW, working 3-phased with the Smartwind Inverter SW5.5 and Sunny Islands. The other site is working with 5 pcs. ANTARIS 9.5 kW working […]
New installation in Ravensthorpe, Australia

ANTARIS 6.5 kW working on an 18.0 m custom designed Tower.The turbine is working 1-phased grid connected with 2 pcs 5.0 kW Ginlong Inverter. The max. Power to the grid is 9.5 kW.The complete system is controlled from our cabinet, working with an 6.0 kW dumpload. Enjoy the wind with ANTARIS Windturbines!
ANTARIS Wind Turbines working in Kuwait

The ANTARIS 9.5 kW is working near Kuwait on an 18 m custom designed monopole tower.The Turbine works in an 3-phased off-grid hybrid system with PV and 3 pcs. Sunny Islands.Because of the hot weather and the sandy area, the turbine works more efficient than PV.The system was installed from our partner: www.kuwait-cool.comThey made a […]