Skip to main content

BRAUN Windturbinen GmbH

BRAUN Windturbinen GmbH supports BVJ pupils

The BVJ gt 16b class of the BBS Montabaur has produced beautiful candle holders and glass lanterns just in time for the pre-Christmas season.The students were trained in the handling of sheet metal and the associated processing tools, including soft soldering.The candlesticks, lanterns and other wooden products are later sold by the students at the […]

ANTARIS Turbines are producing electrical Energy for Africa

The ANTARIS 7.5 kW wind turbine is working in an hybrid system with PV on a 12 m lifting monopole tower. The complete system is working with 3 Sunny Islands, 2 Sunny Tripower and 1 Smartwind 7.5. If you have questions concerning that project, please feel free to contact us. https://www.braun-windturbinen.com/know-how-en/insular-systems/ We produce energy for […]

In Belgium, they are happy about 3 more ANTARIS 7.5 kW small wind turbines

Almost shortly before the approaching winter, 3 pieces of ANTARIS 7.5 kW were installed in Belgium at Renson (http://www.renson.de/renson-3.html).The turbines were built on an 11 m high hall roof .The substructure is a construction of T-beams, the masts are each a guyed 9.0 m high tipping mast.The turbines all work in 3-phase parallel to the […]

The ANTARIS 7.5 kW in Schleswig-Holstein

This system also works in 3-phase parallel to the grid with a Smartwind 7.5 kW.The special feature here, on special customer request, the system was placed on a 21 m tilting mast (hydraulic) from BFtec.The mast does not have a concrete foundation, but a so-called steel root. http://www.bftec.de/produkte/steelroots.htmlAt the moment, an average of 2 plants […]

… and on it goes ́ in Baden-Württemberg!

Construction of the ANTARIS 5.5 kW on a permit-free 10 m tilting mast. The customer received a verifiable mast statics and the associated foundation plan from us.The repeller diameter was increased from D4.0 m to D5.3 m due to the low overall height.The system works in 3-phase parallel to the grid with a Smartwind SW5.5.If […]

Better horizontally than vertically!

Unfortunately, this customer had made a mistake with his vertical wind turbine.As is usually the case with these “providers”, nothing works and the manufacturer Fa. has disappeared very quickly.So the customer just took money in his hands again and decided on a system “Made in Germany”.The ANTARIS 3.5 kW works here in 1-phase parallel to […]

Special promotion “Autumn Wind” at BRAUN Windturbinen GmbH

Take advantage of our special offer in autumn 2016 with the ANTATIS 2.5 kW. You will receive the 2.5 kW turbine together with a 7.5 m tilting mast at a one-time special price, valid until 31.12.2016. The offer is particularly interesting for all customers who are allowed to build nationwide up to a total height […]

The generators of the CK series from BRAUN Windturbinen GmbH, in a class of their own

The generators are installed worldwide for a wide variety of applications, including combined heat and power plants, water wheels or horizontal wind turbines. https://www.braun-windturbinen.com/produkte/generatoren/ Do you have any questions about the generators? Give us a call, we will be happy to advise you in detail. Joy in the wind with ANTARIS small wind turbines!

When ignorance and stubbornness meet

In the municipality of Gudow, very strange things are currently happening in terms of contra wind power.The construction of an ANTARIS 9.5 kW small wind turbine on a 24 m mast at a local industrial site in the municipality of Gudow, Schleswig-Holstein, is planned and already approved.Currently, a small group of die-hards from the community […]