BRAUN Windturbinen GmbH

News & Updates

Another failed chinese Turbine – ANTARIS 6.5 kW is installed now

Poland 6.5 kWAnother failed Chinese Turbine was replaced in Poland, the ANTARIS 6.5 kW is installed now.

The turbine is working 3-phased grid connected and everything is fine now for the customer.

The Installation made our Partner in Poland:

http://www.albedor.eu/

 

 

 

Related articles

Share this Story