BRAUN Windturbinen GmbH

News & Aktuelles

Another failed chinese Turbine – ANTARIS 6.5 kW is installed now

Polen 6.5 kWAnother failed chinese Turbine was replaced in Poland, the ANTARIS 6.5 kW is installed now.

The turbine is working 3-phased grid connected and everything is fine now for the customer.

The Installation made our Partner in Poland:

http://www.albedor.eu/

 

 

 

Ähnliche Beiträge

Allgemein

Die ANTARIS 2.5 in Spitzbergen

Die beiden ANTARIS 2.5 kW versorgen hier die Forschungsstation in Spitzbergen mit Windstrom. https://www.awi.de/…/stationen/awipev-forschungsbasis.html https://braun-windturbinen.com/…/antari…/antaris-2-5-kw Der verbaute

Share this Story