Here is the installation of the ANTARIS 7.5 kW on a 12m tilting mast.
The system works in 3-phase parallel to the grid in a hybrid system with a PV system.
Both systems are connected to a battery storage system and complement each other perfectly, depending on the seasons.
If you have any questions about the project, please contact us.
Joy of the wind with ANTARIS wind turbines.