The Antaris 5.5 kW was built here on a 7.0m high tilting mast and is therefore procedure-free in Bavaria (permit-free up to 10m total height).
The system works here in 3-phase parallel to the grid with the Smartwind SW5.5.
Excess power is currently burned via a 6.0 kW brake resistor.
Later, a 6.0 kW heating element will also be installed in order to make good use of the excess power.
The system was installed by our local partner, the company Aggretec (https://aggretech.de/kleinwindanlagen/)
If you have any questions about the project, please give us a call!
Joy of the wind with ANTARIS wind turbines.