The wind turbine stands here on a 7.0 m tilting mast and is therefore a procedure-free construction project in NRW.
https://braun-windturbinen.com/produkte/antaris-kleinwindanlagen/antaris-5-5-kw/
The ANTARIS wind turbine was installed by Umstro: http://umstro.com/
Respect and recognition for the performance and many thanks for the good cooperation.
The wind turbine is located in OWL and is used by TH OWL (https://www.th-owl.de/) together with a PV system to operate a field laboratory.
The aim of the experiments is to research various P2G processes.
https://www.th-owl.de/
Joy of the wind with ANTARIS wind turbines!





