BRAUN Windturbinen GmbH

News & Updates

The ANTARIS 2.5 kW installed in NRW

The smallest turbine of the ANTARS series was installed today on a 10 m tilting mast .

Our local sales partner: http://www.albert-fink.de/ The assembly was accompanied and documented with numerous photos and videos by our mast manufacturer: http://saw-stahl.net/.

Visibly impressed by the concentrated competence on site was our customer Mr. K.

But when everything was done professionally in 3 hours, the motto also applied to him:

Joy in the wind, with ANTARIS small wind turbines!

Related articles

Share this Story