BRAUN Windturbinen GmbH

Wind farm in Portugal

The first wind farm with 40 ANTARIS wind turbines in grid-parallel operation is currently being built in Portugal! The turbines each have an output of 3.6 kW, and completion is scheduled for the end of 2008.