Wind farm in Portugal
The first wind farm with 40 ANTARIS wind turbines in grid-parallel operation is currently being built in Portugal! The turbines each have an output of 3.6 kW, and completion is scheduled for the end of 2008.
The first wind farm with 40 ANTARIS wind turbines in grid-parallel operation is currently being built in Portugal! The turbines each have an output of 3.6 kW, and completion is scheduled for the end of 2008.