BRAUN Windturbinen GmbH

The ANTARIS 12.0 kW in France!

The plant works here near the French Atlantic coast on an 11m high tilting mast.The 3-phase building supply is provided by the Smart!wind SW10. With regard to storm protection, the following system parameters are monitored:Speed (rpm), V DC, V AC, Wind Speed Furthermore, a braking box is installed, which activates the speed-controlled generator short circuit […]

The 2018 season has already started

The ANTARIS 5.5 kW on a 10m high tilting mast.The system works on an ostrich farm in Bulgaria in 3-phase parallel to the grid.The diameter of the repeller is 4.0 m. The CK7.5 kW generator was installed.The Smart!wind SW5.5 is installed here as a wind inverter. If you have any questions about the project, please […]