BRAUN Windturbinen GmbH

2. ANTARIS supplies greenhouse from the Schenck nursery

The 1st turbine (Antaris 3.5 kW) was already built in 2009, which is now being reinforced by the Antaris 4.5 kW.Due to the rather moderate wind conditions in the Frankfurt area, the 4.5 turbine has the larger low-wind repeller with D5.3 mBoth systems work parallel to the grid with the good old Windy Boys to […]