And it continues in Schleswig-Holstein

Here the Antaris 5.5 kW with the repeller D4.40m on a 9.20m tilting mast. The Antaris works here in 3-phase parallel to the grid with the TRIO 5.8 from FIMER. Our customer fought bravely for 1.5 years for his building permit. And yes, almost exactly to the day with the commissioning of the wind turbines, […]
Mounting setup of the ANTARIS 6.5 kW, 3-phase grid-parallel / heating in Schleswig-Holstein
The ANTARIS is built here on a 21 m high tubular mast (wind zone 4). The system was installed by our local partner, the company Elektro Röhe GmbH & Co. KG. This is the 1st plant in SH in 2015, 10 more are planned for this year in SH or partly already approved. The next […]