The ANTARIS 4.5 kW in Portugal

The small wind turbine operates 3-phase grid parallel in the sun-kissed land on a 12 m high lattice tower.In the years 2009 – 2014 were about 85 pcs. ANTARIS small wind turbines in the power range from 2.5 kW – 4.5 kW built.All systems work parallel with the grid. Formerly with the Windy Boy, currentnow […]

The ANTARIS 4.5 kW in Portugal

The small wind turbine works in the sun-drenched country on a 12 m high lattice mast in 3-phase parallel to the grid.In the years 2009 – 2014, approx. 85 pcs. ANTARIS small wind turbines in the power classes from 2.5 kW – 4.5 kW .All systems work parallel to the grid. Formerly with the Windy […]

Wind farm in Portugal

The first wind farm with 40 ANTARIS wind turbines in grid-parallel operation is currently being built in Portugal! The turbines each have an output of 3.6 kW, and completion is scheduled for the end of 2008.

December 2009

All ANTARIS 5.5 kW turbines produced up to 68 kWh of clean wind power per day at exposed locations in Portugal in December. In Portugal, one of the 3.5 kW turbines has achieved an annual yield of 4,600 kWh, while the solar power plant with the same output has a yield of 3,900 kWh. You […]