The Antaris 12 kW installed in Baden-Württemberg

Here is another installation of the Antaris 12 kW on a 24 m mast in BW. The scope of the permit includes a soil survey, the tested mast statics and the bat control. The Antaris 12 kW works in 3-phase parallel to the grid with heating support and thus supplies a farm with electricity and […]