The ANTARIS 6.5 kW 3-phased grid connected on a 21 m high tubular tower in Lower Saxony / Germany.
At that site a bat report could be dispensed, because it was the first site where a bat protection box was installed.
Enjoy the wind!



The ANTARIS 6.5 kW 3-phased grid connected on a 21 m high tubular tower in Lower Saxony / Germany.
At that site a bat report could be dispensed, because it was the first site where a bat protection box was installed.
Enjoy the wind!




In April 2025, the first Antaris 12 kW was already erected in the Free State of