It’s been a while since the last ANTARIS was set up in PT, so we are happy about the current installation.
It is the ANTARIS 4.5 kW as a 48V DC battery charger.
The wind turbine is installed on a 7.0m high tilting mast in the rather hilly interior of the country and is used for the domestic power supply.
The current is dissipated via 5-fold slip rings, 3x generator and 2x geno temperature monitoring.
The built-in PLC in the cabinet takes over the wind monitoring via wind sensor.
The installation was carried out by our sales partner in PT,
Respect and recognition for this:
If you have any questions about the project, please contact us, we will be happy to advise you.
Joy of the wind with ANTARIS wind turbines!


