The ANTARIS 5.5 kW in Bavaria!

The Antaris 5.5 kW was built here on a 7.0m high tilting mast and is therefore procedure-free in Bavaria (permit-free up to 10m total height). The system works here in 3-phase parallel to the grid with the Smartwind SW5.5. Excess power is currently burned via a 6.0 kW brake resistor. Later, a 6.0 kW heating […]
The ANTARIS 5.5 kW in Jülich

Forschungszentrum Jülich ( https://www.fz-juelich.de/portal/DE/zentrum/_node.html) has now erected its ANTARIS 5.5 kW / D4.40m on a 24m high mast.The system works here in 3-phase parallel to the grid with the Smartwind SW5.5 (https://smart-power-electronics.de/).Furthermore, the system is equipped with a wind sensor for wind shutdown and a bat control system with temperature and wind detection.https://braun-windturbinen.com/produkte/fledermausschutz/In order to […]
The ANTARIS in the north of Germany

Yield overview of the Antaris 7.5 kW on 24m mast height. Starting with 03.2015 – 07.2020. The system works here with the Smartwind SW7.5 https://braun-windturbinen.com/produkte/wind-wechselrichter/ https://smart-power-electronics.de/ If you have any questions about the project, please give us a call! Joy of the wind with ANTARIS wind turbines. Yield evaluation EDER 2020
The ANTARIS installed, somewhere in eastern Russia

The ANTARIS 4.5 kW works here as a 48V DC battery charger in an off-grid region in the Altai Mountains.After a 6-month test phase over the harsh winter, the wind turbine has left a positive impression on the operator.Quality “Made in Germany”! In a further 2 construction phases, 6 more Antaris wind turbines of the […]
The ANTARIS 3.5 kW in Schleswig-Holstein!

The ANTARIS was installed here on a 7.0m tilting mast and is therefore procedure-free.With the ABB-UNO-3.3-TL, the wind turbine operates in 1-phase (230V AC) parallel to the grid.Excess energy is dissipated via a 3.5 kW brake resistor.The wind is monitored via a wind sensor, which is attached to the mast with a boom.The electrical installation […]
The Antaris 12 kW wind turbine at 30m!

Here the ANTARIS 12 kW works on a 30m high tubular mast in Bavaria.These masts are specially manufactured for hilly inland locations, such as in Bavaria.The mast statics and the foundation plan both contain verifiable documents. The system works here in 3-phase parallel to the grid with the Smart!wind SW10.Excess energy is dissipated via 2 […]
The ANTARIS 7.5 kW in Hesse

The ANTARIS wind turbine works here on a 24m mast in 3-phase parallel to the grid and with heating support.Here, 3.0 kW is set to the house grid, then to the 6.0 kW heating element in the service water tank.The system manager here is the Smart!wind SW7.5; https://braun-windturbinen.com/produkte/wind-wechselrichter/The customer took over the assembly and assembly […]
The ANTARIS 5.5 kW in northern Germany!

The ANTARIS wind turbine is installed here on a 9.20m tilting mast. The system works with the wind inverter “Smart!wind SW5.5” and a PV system 3-phase off-grid.The system is controlled by 3 Sunny Islands, connected to a 48V DC battery bank.A diesel generator serves as a backup in case there is no sun and no […]
ANTARIS wind turbines defy strong winds and bad weather
After the continuous rain of the last few weeks, a lot of installations have piled up, but finally things are moving on.Assembly of 2 pieces ANTARIS 5.5 kW with repeller diameter D4.40m.The turbines are each built on 7.0m high tilting masts and work in 3-phase parallel to the grid, each with a Smart!wind SW5.5.Due to […]
The ANTARIS 12.0 kW in France!

The plant works here near the French Atlantic coast on an 11m high tilting mast.The 3-phase building supply is provided by the Smart!wind SW10. With regard to storm protection, the following system parameters are monitored:Speed (rpm), V DC, V AC, Wind Speed Furthermore, a braking box is installed, which activates the speed-controlled generator short circuit […]