The ANTARIS wind turbines in Russia

Here 2 pieces of ANTARIS 4.5 kW 48V DC are working in the Russian ALTEI Mountains. https://de.wikipedia.org/wiki/Altai The ANTARIS wind turbines supply a 48V DC battery storage system there.Due to the altitude above sea level (2,800m), the larger repeller diameter D4.40m was installed here.In addition, wind monitoring with online monitoring is installed in the control […]
The ANTARIS 3.5 kW on the road in France

The existing system from another manufacturer was replaced by the ANTARIS 3.5 kW.The wind turbine works in 1-phase parallel to the grid with an ABB UNO-4.0, installed in the west of France.https://braun-windturbinen.com/produkte/wind-wechselrichter/A Power Curve Controller installed in our control cabinet gives the ABB the adjustable characteristic curve via RS485.This can be set either V DC […]
The ANTARIS 7.5 kW produces electricity and heat in Schleswig-Holstein!

Here, the Antaris wind turbine works on a 12 m high tilting mast in 3-phase parallel to the grid for the self-supply of electricity and heating support with a 6.0 kW heating element.The system is hoisted up with a winch, over a jut tree as a deflection point.Since the small wind turbine is subject to […]
The ANTARIS 3.5 kW in Sweden

Here the ANTARIS 3.5 kW works on a 12m high wooden mast “Dali Performance” installed in Sweden. The system operates off-grid in a 3-phase hybrid system with Sunny Island. The system was installed by the company Innoventum, Mr. Daligault: Thanks to Julien for his perfect Job! If you have any questions about the project, please […]
The ANTARIS 2.5 kW installed in Belgium

Even in times of pandemic, the ANTARIS wind turbines continue to be installed. This time in Belgium, on a 12m tilting mast. The system works here in 1-phase parallel to the grid with an ABB-UNO-3.3 wind inverter. On the photos you can see the wind inverter with brake resistor, as well as an additional “stop […]
Water march, renovation work successfully completed

The Pelton turbine works here with a “Windy Boy 2500” grid inverter in 1-phase parallel to the grid.The adjustable characteristic curve in the Windy Boy enables optimum energy yield from the turbine.Via a separate control system including brake resistor, the 3-phase generator voltage is rectified and transmitted to the inverter.The remarkable smoothing of the geno […]
The ANTARIS 7.5 kW in northern France
The ANTARIS 7.5 kW was set up here on an 11m high tilting mast.In France, 12m hub height is procedure-free.The mast is laid via hydraulics. The system works in 3-phase parallel to the grid with the Smart!wind SW7.5 kW.https://smart-power-electronics.de/smart-windWhen measuring the wind, the wind direction is also displayed here. Mast design, incl. hydraulics, as well […]
Savonius construction in Saxony

Near Neustadt in Saxony, our customer built, assembled and finally installed his Savonius.Our CK7.5 generator was installed here, with the corresponding Savonius special winding.Currently, the energy generated is processed via a 3-phase heating element.Later, 3-phase mains parallel operation with heating support may take place.Congratulations and respect for the remarkable achievement! If you have any questions […]
Water wheel back in operation!

After some setbacks, the water wheel system has now been successfully put back into operation.The overshot wheel has a diameter of D6.0m. The maximum power is 5.8kW and is limited by the water inlet with integrated bypass.(https://www.planet-schule.de/sf/multimedia-interaktive-animationen-detail.php?projekt=wasserraeder)The system works with the Smart!wind SW5.5, 3-phase parallel to the grid.In the event of a power failure or […]
The ANTARIS 5.5 kW in Baden-Württemberg 2020

The ANTARIS 5.5 kW was built here on a 9.2m high tilting mast and is therefore procedure-free in BW (permit-free up to 10m hub height).The system works here in 3-phase parallel to the grid with the Smart!wind SW5.5. The repeller diameter installed here is D4.40m.In addition, a bat control system has been installed here, see […]