BRAUN Windturbinen GmbH

Assembly setup at the Polish border

Our customer has a total of 3 ANTARIS wind turbines built. 2 of them are the ANTARIS 7.5 kW on an 18 m mast each.The systems operate in an off-grid system with a Sunny Island inverter. See also the following link:https://braun-windturbinen.com/knowhow/inselbetrieb/ The other system is an ANTARIS 2.5 kW and works as a 48V DC […]

Well, that was a short summer break

In the meantime, 2 more Antaris 3.5 kW turbines have been installed by our partner in Belgium.Link: http://www.sillelec.com/ The turbines both operate in 1-phase parallel to the grid, each with an ABB-PVI 3.6 kW wind inverter.The 3.5 kW braking resistor and the turbine control ensure safe plant operation at a mast height of 10 m. […]

BRAUN Wind Turbines has successfully tested the new ABB TRIO inverters for wind

Already in autumn 2017 we were informed about the discontinuation of the ABB/PO wind inverters.We immediately got to work with our partner to look for alternatives.With success, thanks to courageous commitment and also with the support of ABB.After about 8 months of development work, the new TRIO solar inverters for wind are available.The wind parameters […]

And again another ANTARIS 10kW goes into operation

The ANTARIS works here on a 24m high tubular mast and is 3-phase on the grid with self-consumption.It is used to supply electricity to the customer’s own commercial enterprise.The system is maintained by us free of charge via remote maintenance.In addition to the wind sensor for system monitoring, a bat box is also installed, see […]

Another ANTARIS 10kW starts operation!

The ANTARIS 10kW works here on a 24m high tubular mast and is 3-phase on the grid with self-consumption.In addition, service water is heated via a 6.0kW heating element.The system is maintained by us free of charge via remote maintenance.We carry out the customer’s requests for changes to the set performance parameters (mains / heating) […]

BRAUN Wind Turbines has successfully tested the new ABB DM inverters for wind!

Already in autumn 2017 we were informed about the discontinuation of the ABB/PO wind inverters.We immediately got to work with our partner to look for alternatives.With success, thanks to courageous commitment and also with the support of ABB.After about 6 months of development work, the new DM solar inverters for wind are available.The wind parameters […]

ANTARIS 3.5 kW and 2.5 kW Wind Turbines installed in France!

Another finished installations in France, done from our Partner DIWATT.https://www.diwatt.fr/The turbines are working 1-phased grid connected with ABB/PO Inverter on customers designed monopole towers.https://www.braun-windturbinen.com/products/wind-inverter/ If you have more questions concerning those projects, please feel free to contact us.https://www.braun-windturbinen.com/products/antaris-small-wind-turbines/antaris-3-5-kw/ Enjoy the wind with ANTARIS Windturbines!

Successful self-built layout, respect for that!

With a lot of dedication and above all passion, our customer has built his own wind turbine here.The complete repeller D3.5m, the generator CK3.5, as well as the feed-in electronics were supplied by us.Of course, all this with our technical support during planning and construction. If you have any questions about the project, please give […]

Another Antaris wind turbine was built on the border with the Czech Republic

The ANTARIS 3.5 kW works here on an 11 m high lattice mast in heating mode.The heating control system works characteristically guided by a 6.0 kW heating element.The repeller blades are black to allow for faster defrosting in the event of frost in winter. If you have any questions about the project, please call us.We […]

The 2018 season has already started

The ANTARIS 5.5 kW on a 10m high tilting mast.The system works on an ostrich farm in Bulgaria in 3-phase parallel to the grid.The diameter of the repeller is 4.0 m. The CK7.5 kW generator was installed.The Smart!wind SW5.5 is installed here as a wind inverter. If you have any questions about the project, please […]