BRAUN Windturbinen GmbH

Successful installation of the Antaris 12 kW in Saxony on a 24m mast!

In the Free State of Saxony, the Antaris 12 kW now stands on an impressive 24m mast! The installation was carried out in-house by our customer, Seilerei Voigt. Respect and recognition for that! Here you can find more information about the Voigt rope factory: https://www.seilerei-voigt.de The Antaris 12 kW works here in 3-phase parallel to […]

The Antaris 7.5 in Lower Saxony

Another Antaris 7.5 kW installed on a 12m tilting mast in Lower Saxony. The commissioning could take place in the best weather. Special thanks for the beautiful photo with sunset! Respect and recognition for the project carried out in-house. The wind turbine could be installed without a procedure, as the freedom of procedure applies up […]

The Antaris 7.5 kW in Finland

And yes, they still exist, the individualists, and that’s a good thing. Our customer has installed an Antaris 7.5 kW on a 20m high hydraulic mast in Finland. Below you can see the sauna building, with a direct view of the lake. The Antaris works in 3-phase parallel to the grid with the FIMER Trio […]

The journey continues in 2025! – New ANTARIS 7.5 kW wind turbines in Hesse

In 2025, the development of decentralized energy generation will continue – in Hesse, three Antaris 7.5 kW wind turbines were recently successfully installed, each on a 7.0 m high mast. The Antaris wind turbines offer an efficient and reliable way to harness wind energy and create a powerful hybrid system with the integrated solar system. […]

Merry Christmas and a successful New Year!

The year is coming to an end, and we look back on an exciting and eventful time. Together, we have overcome challenges, initiated new projects and developed sustainable solutions for the future. In the contemplative Christmas season, we would like to thank our suppliers and customers very much – for your trust, cooperation and support. […]

The last Antaris wind turbine installed for 2024

The Antaris 5.5 kW (D4.40 m) was built here near Gothenburg in Sweden on a 12 m high wooden mast by the company Innoventum. The wind turbine works in 3-phase parallel to the grid with the FIMER Trio 5.8. As always, the Antaris 5.5 has the well-known safety parameters installed: PLC wind, V DC monitoring, […]

The Antaris 12 kW installed in Baden-Württemberg

Here is another installation of the Antaris 12 kW on a 24 m mast in BW. The scope of the permit includes a soil survey, the tested mast statics and the bat control. The Antaris 12 kW works in 3-phase parallel to the grid with heating support and thus supplies a farm with electricity and […]

And it goes on in Bavaria…

Here, the Antaris 5.5 kW with the repeller diameter D4.40 m is installed on a 15m high tipping mast in Bavaria. https://braun-windturbinen.com/…/antari…/antaris-5-5-kw The Antaris works in 3 phases parallel to the TRIO 5.8. Safety: PLC wind, V DC monitoring, helicopter function, Generator CK7.5 kW If you have any questions about the project, please contact us, […]

And again installed an Antaris

Here the Antaris 5.5 kW was installed on a 12m tilting mast in North Rhine-Westphalia. https://braun-windturbinen.com/…/antari…/antaris-5-5-kw Our verifiable mast documents with foundation plan have been approved via test statics. In addition, the customer has added a soil survey to confirm the foundation information including reinforcement. The Antaris works in 3 phases parallel to the TRIO […]

The Antaris 7.5 kW installed in the Spessart

The Antaris was built and installed here on a 7.0m high mast (procedure-free) on its own. Just in time to make the most of the dark and windy season. https://braun-windturbinen.com/…/antari…/antaris-7-5-kw Respect and recognition for it, after all, was the 1st facility. The Antaris works here in 3-phase parallel to the grid with the TRIO 7.5 […]