BRAUN Windturbinen GmbH

News & Updates

ANTARIS 6.5 kW installed near Lübeck

The system works on a 21 m tubular mast, 3-phase parallel to the grid with a Smartwind SW7.5.

If you have any questions about the project, give us a call!

Joy in the wind, with ANTARIS small wind turbines!

Related articles

Share this Story