BRAUN Windturbinen GmbH

News & Updates

ANTARIS 6.5 kW in Saudi Arabia

1013

The ANTARIS 6.5 kW as Energyproducer in Saudi Arabia, working in a 3-phased Hybridsystem with PV.
The System is working with 3 pcs. Sunny Islands (each 5.0 kW) as Energymanager, one Smart Wind Inverter 7.5 kW and one SMA Tripower 10.0 kW.
That is the first Telecommunication Installation from complete 15 pcs. in Saudi Arabia.

 

Related articles

General

The summer break is over!

Success all along the line – the ANTARIS 7.5 now also in Bavaria! We are celebrating

Share this Story