The ANTARIS 6.5 kW in 3-phase grid-parallel operation.
The turbine has a hub height of 24 m and works with the Smart!wind 7.5 kW.
The location is in the zip code area 59…
The foundation construction is remarkable here, as it was integrated into a raised sound insulation insulation.
This is the 3rd plant in the region within a year, with 5 more planned for 2014.
The first construction work for the body of the new ANTARIS 9.5 kW is currently underway.


