The ANTARIS 4.5 kW Turbine working as 48 VDC Battery charger in an hybrid System near Murmansk.
That is the first from 5 Energystations supplying Electricity to the rural Communities in that Area.


The ANTARIS 4.5 kW Turbine working as 48 VDC Battery charger in an hybrid System near Murmansk.
That is the first from 5 Energystations supplying Electricity to the rural Communities in that Area.
Another Antaris 7.5 kW installed on a 12m tilting mast in Lower Saxony. The commissioning could
And yes, they still exist, the individualists, and that’s a good thing. Our customer has installed
The Antaris 12kW on an 18m high mast in SH. https://braun-windturbinen.com/…/antaris…/antaris-12-kw Currently, this wind turbine is