BRAUN Windturbinen GmbH

News & Updates

Well, that’s a really clean installation

Yes, that’s how they are the Swiss, there is still value on professional work.

The ANTARIS 7.5 kW rotates here on a 12m tilting mast, 3-phase parallel to the grid with a Smartwind inverter SW10.

There is no need for a crane or lifting platform, as the tilting mast is erected via a jut boom and winch.

Below the repeller blades, the wind sensor is attached to the mast.

If you have any questions about the project, please give us a call!

Joy of the wind with ANTARIS wind turbines.

Related articles

Share this Story