The ANTARIS 6.5 kW 3-phased grid connected on a 21 m high tubular tower in Lower Saxony / Germany.
At that site a bat report could be dispensed, because it was the first site where a bat protection box was installed.
Enjoy the wind!



The ANTARIS 6.5 kW 3-phased grid connected on a 21 m high tubular tower in Lower Saxony / Germany.
At that site a bat report could be dispensed, because it was the first site where a bat protection box was installed.
Enjoy the wind!




In April 2025, the first Antaris 12 kW was already erected in the Free State of

With every new Antaris plant, the joy of having your own, independent electricity grows. Recently ,

And it is exactly this wind that we have now captured! Our largest wind turbine, the