A hydroelectric power plant with 17 kW in continuous operation was installed in France.
The CK 18 was installed as a generator, robust and powerful:
https://www.braun-windturbinen.com/produkte/generatoren/
The system is completely monitored with speed, generator temperature, DC voltage, DC current.
The feed-in is carried out with a Sunny Tripower 17,000 TL from SMA, in constant-voltage operation.
Do you have any questions about the project?
Call us, we will be happy to advise you in detail.

