BRAUN Windturbinen GmbH

News & Updates

The ANTARIS 7.5 kW in Schleswig-Holstein

This system also works in 3-phase parallel to the grid with a Smartwind 7.5 kW.
The special feature here, on special customer request, the system was placed on a 21 m tilting mast (hydraulic) from BFtec.
The mast does not have a concrete foundation, but a so-called steel root.
http://www.bftec.de/produkte/steelroots.html
At the moment, an average of 2 plants / week are set up worldwide.
We therefore ask for your understanding for the current delivery times of up to 3 months.

Joy in the wind with ANTARIS small wind turbines.

Documentation-ANTARIS_7-5_de

Related articles

Share this Story