BRAUN Windturbinen GmbH

News & Updates

ANTARIS peak electricity production in Denmark

ANTARIS 6.0 kW with repeller D 5.10 m produced 121kWh in Denmark on 27.11.2011.
The turbine works with 2 WB3300 2-phase mains parallel operation, with a hub height of 21 m.

Related articles

Share this Story