BRAUN Windturbinen GmbH

News & Aktuelles

ANTARIS Windturbines – New installation in the north from Turkey

ANTARIS Windturbines – Energy for the world!

ANTARIS 4.5 kW working on an 24.0 m custom designed Tower.

The turbine is working to a 48 VDC battery bank.

The complete system is controlled by our cabinet, working with 2 pcs. 3.0 kW dumploads.

The client (turkish government) is working 3-phased with Victron Energy Inverter.

If you have more questions concerning that project, please feel free to contact us.

Enjoy the wind with ANTARIS Windturbines!

Ähnliche Beiträge

Allgemein

Und wieder eine Antaris installiert

Hier wurde die Antaris 5.5 kW auf einem 12m Kippmasten in NRW installiert.  https://braun-windturbinen.com/…/antari…/antaris-5-5-kw Unsere prüffähigen

Share this Story