Wolfgang Frey, an architect from Freiburg, enters the wind power debate with treetop wind turbines. He installed an ANTARIS 3.5 kW small wind turbine on a Douglas-fir that was 30 metres high as a pilot plant in Freiamt in the district of Emmendingen. A legal loophole in the rules on authorisation makes this possible.

Allgemein
Wieder ein Windprojekt, das begeistert!
In Niedersachsen entsteht derzeit eine weitere ANTARIS 7.5 kW Windenergieanlage auf einem 12 m Kippmast –

