{"id":17545,"date":"2014-02-06T15:31:59","date_gmt":"2014-02-06T13:31:59","guid":{"rendered":"https:\/\/braun-windturbinen.com\/wind-farm-in-portugal\/"},"modified":"2014-02-06T15:31:59","modified_gmt":"2014-02-06T13:31:59","slug":"wind-farm-in-portugal","status":"publish","type":"post","link":"https:\/\/braun-windturbinen.com\/en\/wind-farm-in-portugal\/","title":{"rendered":"Wind farm in Portugal"},"content":{"rendered":"<p>In Portugal, the first wind park with 40 ANTARIS wind turbines, whose operation takes place in parallel with a network, is presently developing.<br \/>\nEach machine provides 3.6 kW. Completion is to take place until the end of 2008. <\/p>\n<p><a href=\"http:\/\/www.braun-windturbinen.com\/wp-content\/uploads\/news_windpark_portugal.jpg\" rel=\"lightbox[17545]\"><img decoding=\"async\" class=\" wp-image-1766 alignnone\" alt=\"news_windpark_portugal\" src=\"http:\/\/www.braun-windturbinen.com\/wp-content\/uploads\/news_windpark_portugal.jpg\" width=\"250\" srcset=\"https:\/\/braun-windturbinen.com\/wp-content\/uploads\/news_windpark_portugal.jpg 500w, https:\/\/braun-windturbinen.com\/wp-content\/uploads\/news_windpark_portugal-128x150.jpg 128w, https:\/\/braun-windturbinen.com\/wp-content\/uploads\/news_windpark_portugal-256x300.jpg 256w\" sizes=\"(max-width: 500px) 100vw, 500px\" \/><\/a><\/p>\n","protected":false},"excerpt":{"rendered":"<p>In Portugal, the first wind park with 40 ANTARIS wind turbines, whose operation takes place in parallel with a network, is presently developing. Each machine provides 3.6 kW. Completion is to take place until the end of 2008.<\/p>\n","protected":false},"author":1,"featured_media":0,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[351],"tags":[],"class_list":["post-17545","post","type-post","status-publish","format-standard","hentry","category-general"],"_links":{"self":[{"href":"https:\/\/braun-windturbinen.com\/en\/wp-json\/wp\/v2\/posts\/17545","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/braun-windturbinen.com\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/braun-windturbinen.com\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/braun-windturbinen.com\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/braun-windturbinen.com\/en\/wp-json\/wp\/v2\/comments?post=17545"}],"version-history":[{"count":0,"href":"https:\/\/braun-windturbinen.com\/en\/wp-json\/wp\/v2\/posts\/17545\/revisions"}],"wp:attachment":[{"href":"https:\/\/braun-windturbinen.com\/en\/wp-json\/wp\/v2\/media?parent=17545"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/braun-windturbinen.com\/en\/wp-json\/wp\/v2\/categories?post=17545"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/braun-windturbinen.com\/en\/wp-json\/wp\/v2\/tags?post=17545"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}