{"id":17517,"date":"2014-06-10T18:48:13","date_gmt":"2014-06-10T16:48:13","guid":{"rendered":"https:\/\/braun-windturbinen.com\/mounting-setup-antaris-4-5-kw-grid-parallel\/"},"modified":"2025-03-24T15:57:40","modified_gmt":"2025-03-24T13:57:40","slug":"mounting-setup-antaris-4-5-kw-grid-parallel","status":"publish","type":"post","link":"https:\/\/braun-windturbinen.com\/en\/mounting-setup-antaris-4-5-kw-grid-parallel\/","title":{"rendered":"Mounting setup ANTARIS 4.5 kW grid-parallel"},"content":{"rendered":"\n<p>Assembly setup of the ANTARIS 4.5 kW parallel to the grid on a 14 m high tipping mast in postcode area 19&#8230;. .<br \/>The turbine works in 3-phase parallel to the grid with a Smart!wind 5.5 kW.<br \/>Despite problems during the approval phase, the project was successfully completed.<br \/>The good cooperation between the client, the architect and BRAUN Windturbinen GmbH was remarkable.<br \/>The facility can be visited, including competent advice on site.<br \/>The BRAUN Wind Turbine team wants a breeze of wind on the repeller at all times. <\/p>\n\n<figure class=\"wp-block-gallery has-nested-images columns-6 is-cropped wp-block-gallery-1 is-layout-flex wp-block-gallery-is-layout-flex\">\n<figure class=\"wp-block-image size-large\"><img fetchpriority=\"high\" decoding=\"async\" width=\"600\" height=\"511\" data-id=\"3161\" src=\"https:\/\/braun-windturbinen.com\/wp-content\/uploads\/\/P10506501-600x511.jpg\" alt=\"\" class=\"wp-image-3161\" srcset=\"https:\/\/braun-windturbinen.com\/wp-content\/uploads\/P10506501-600x511.jpg 600w, https:\/\/braun-windturbinen.com\/wp-content\/uploads\/P10506501-150x127.jpg 150w, https:\/\/braun-windturbinen.com\/wp-content\/uploads\/P10506501-300x255.jpg 300w, https:\/\/braun-windturbinen.com\/wp-content\/uploads\/P10506501.jpg 700w\" sizes=\"(max-width: 600px) 100vw, 600px\" \/><figcaption class=\"wp-element-caption\">Assembly setup ANTARIS 4.5 kW in the postcode area 19&#8230;  <\/figcaption><\/figure>\n\n\n\n<figure class=\"wp-block-image size-large\"><img decoding=\"async\" width=\"403\" height=\"600\" data-id=\"3162\" src=\"https:\/\/braun-windturbinen.com\/wp-content\/uploads\/\/P10506621-403x600.jpg\" alt=\"\" class=\"wp-image-3162\" srcset=\"https:\/\/braun-windturbinen.com\/wp-content\/uploads\/P10506621-403x600.jpg 403w, https:\/\/braun-windturbinen.com\/wp-content\/uploads\/P10506621-100x150.jpg 100w, https:\/\/braun-windturbinen.com\/wp-content\/uploads\/P10506621-201x300.jpg 201w, https:\/\/braun-windturbinen.com\/wp-content\/uploads\/P10506621.jpg 471w\" sizes=\"(max-width: 403px) 100vw, 403px\" \/><\/figure>\n\n\n\n<figure class=\"wp-block-image size-large\"><img decoding=\"async\" width=\"186\" height=\"600\" data-id=\"3163\" src=\"https:\/\/braun-windturbinen.com\/wp-content\/uploads\/\/P1050737-186x600.jpg\" alt=\"\" class=\"wp-image-3163\" srcset=\"https:\/\/braun-windturbinen.com\/wp-content\/uploads\/P1050737-186x600.jpg 186w, https:\/\/braun-windturbinen.com\/wp-content\/uploads\/P1050737-93x300.jpg 93w\" sizes=\"(max-width: 186px) 100vw, 186px\" \/><figcaption class=\"wp-element-caption\">The turbine operates on a 14 m tilting mast in 3-phase parallel to the grid with an SW5.5.  <\/figcaption><\/figure>\n<\/figure>\n","protected":false},"excerpt":{"rendered":"<p>Assembly setup of the ANTARIS 4.5 kW parallel to the grid on a 14 m high tipping mast in postcode area 19&#8230;. .The turbine works in 3-phase parallel to the grid with a Smart!wind 5.5 kW.Despite problems during the approval phase, the project was successfully completed.The good cooperation between the client, the architect and BRAUN [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":0,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[351,33],"tags":[370,381],"class_list":["post-17517","post","type-post","status-publish","format-standard","hentry","category-general","category-nicht-kategorisiert","tag-antaris-4-5kw-en","tag-grid-parallel-operation"],"_links":{"self":[{"href":"https:\/\/braun-windturbinen.com\/en\/wp-json\/wp\/v2\/posts\/17517","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/braun-windturbinen.com\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/braun-windturbinen.com\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/braun-windturbinen.com\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/braun-windturbinen.com\/en\/wp-json\/wp\/v2\/comments?post=17517"}],"version-history":[{"count":1,"href":"https:\/\/braun-windturbinen.com\/en\/wp-json\/wp\/v2\/posts\/17517\/revisions"}],"predecessor-version":[{"id":17519,"href":"https:\/\/braun-windturbinen.com\/en\/wp-json\/wp\/v2\/posts\/17517\/revisions\/17519"}],"wp:attachment":[{"href":"https:\/\/braun-windturbinen.com\/en\/wp-json\/wp\/v2\/media?parent=17517"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/braun-windturbinen.com\/en\/wp-json\/wp\/v2\/categories?post=17517"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/braun-windturbinen.com\/en\/wp-json\/wp\/v2\/tags?post=17517"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}